Hi all,
I have a project, consist of two buildings but I want to prepare only a combined LCA report. then should i combined my BoQ before inputting to Etool or possible to build 2 LCA model and get a combined result?
Best! Melvina
You must be logged in to reply to this topic.
Enter the destination URL
Or link to existing content