1
It would be useful to be able to load all impacts when on the Project Analysis tab. At the moment, I have to go into the 6 different structures within the project to get information regarding material quantities which I am putting into a reporting spreadsheet. If there was the option to load all impacts on the Project Analysis tab, I could do this in a few clicks and it would take 5 minutes rather than 30 minutes. This features already exists on the Analysis tab at the Structure level so should be relatively simple to add to the Project Analysis tab.
