With the upcoming March software release, we will be updating the default Construction Waste Factors and Recycled Content for a number of materials to match those defined in the new RICS WLCA PS 2nd Ed. This is to ensure that the assumptions used for these factors are based on reliable sources and remain relevant to current construction practices.

How will your existing projects be affected

Note that the update will affect all existing projects using the eTool Default LCI Group (BRE IMPACT project won’t be affected) in the following way:

  • Existing projects that are still in-progress will only be affected when you add new standalone material elements to your Design. The following factors for the new inputs will vary from your existing Design factors therefore you will need to manually adjust these to ensure consistency as per best practices:

    • default construction waste factors

    • default recycled content

    • default lost/damaged in transport

Updating the factors in your existing Design is not compulsory however it is best practice for your LCA to keep your assumptions within the LCA consistent. You can choose between aligning your LCA with the new assumptions or the old assumptions.

How will eTool’s public templates be affected

Note: the process of updating the public templates will only be completed within the week following the release. We will notify users when this has been completed.

The default Construction Waste, Recycled Content and Lost/Damaged in Transport factors for all public templates (users’ custom templates won’t be affected) will be updated to match the new assumptions. This means that for existing eTool Default projects, the default factors for any new public templates added to your project after the update will no longer match with the factors in the existing template added to your Design. Therefore, once the template update process has been completed, users will need to manually update the assumptions in your templates accordingly should you need to add any new public templates/materials to your existing Design to ensure that your assumptions remain consistent throughout your LCA.

Where these factors have been left as the material’s default, we will be updating all our public templates to align with the new RICS assumptions.

Example 1: If a public concrete template created prior to the release has left the construction waste factors in the original default assumption (10%), we will be updating this template to the new RICS default (5%). 

Example 2: A public structural steel beam template created prior to the release has changed the recycled content from the default 40.33% to 50%. We will not change this factor to match the new RICS default (13%).

How will your custom templates be affected

All custom templates (assigned to your organisation or private) that were created prior to the update won’t be affected even if you left these factors at material defaults. This is to ensure that we do not overwrite your work. If you wish to update your custom templates to the new assumptions, you will need to update them manually.

Below lists the changes between the original assumptions and the new RICS 2E assumptions for your reference.


Default Assumptions

Construction Waste Factors

Materials RICS 2E Assumptions Original Assumption eTool Materials Affected
Concrete in-situ 5% 10% All 524 in-situ concrete materials including FA, BFS & SCM blends
Concrete precast (floor, beams and frames 1% 10% Concrete | Prefabricated Components | Precast Concrete Panels
Concrete (sprayed) 10% N/A No material differentiation, users will need to manually update the chosen material
Steel reinforcement 5% 5% No change
Steel frame (beams, columns, braces) 1% 5% All 3 galvanised structural, hot rolled and hot extruded steel materials
Concrete blocks (lightweight AAC) 10% 5% Bricks, Blocks and Pavers | Light Weight Blocks | Aerated Autoclaved Concrete Blocks
Concrete blocks (dense/medium density) 5% 5% No change
Brickwork (clay) 6% 5% Bricks, Blocks and Pavers | Clay Bricks and Pavers | Unspecified & Recycled
Stone (cladding) 5% N/A No material differentiation, users will need to manually update the chosen material
Stone (landscaping) 10% 15% All 6 rock & stone materials
Mortar and render (internal and external) 4% 10% All 3 mortar & render cementitious binder materials
Screed 8% N/A No material differentiation, users will need to manually update the chosen material
Floor finish (tile) 6% 15% Ceramics | Tiles Ceramic | Tiles
Floor finish (carpet) 6% 20% All 6 nylon/wool carpet materials (not including underlays)
Timber frames (beams, columns, joists, braces) 2% 15% All 8 unspecified supply and sustainably sourced glue laminated and CLT materials
Timber floors (boards) 10% N/A No material differentiation, users will need to manually update the chosen material
Timber formwork 10% (in addition to end-of-life usage rates, see section 4.11.1) N/A No material differentiation, users will need to manually update the chosen material
Aluminium sheet 1% 1% No change
Aluminium extruded profiles/frames 1% 1% No change
Plasterboard 4% 15% All 6 virgin and recycled plasterboard materials
Insulation 7% varies (2%, 10%, 15%) All 56 mineral, glass fibre, plastic, wool, rigid foam/board insulation materials
Aggregate 10% 15% All 7 aggregate materials
Glass 1% 5% Glazing | Glass and Films | Flat Glass
Coatings (paint, intumescent coatings) 6% 15% All 6 paint and stain materials
Sprayed cementitious fire protection to steel 10% N/A No material differentiation, users will need to manually update the chosen material
Asphalt and Bitumen 6% 10% All 28 asphalt & bitumen materials
Roof cladding 5% 7.5% All 3 concrete, slate and clay roofing tile materials

 

Recycled Content

Materials RICS 2E Assumptions Original Assumption eTool Materials Affected
Structural steel sections – rolled sections blended average 47% (60% BOF (13% recycled content), 40% EAF (97% recycled content)) 40.33% All 2 hot rolled and hot extruded steel materials
Structural steel sections – plate and closed sections 13% (100% BOF) 40.33% Ferrous Metals | Steel | Galvanised Structural | Unspecified
Reinforcement bar 96%  95% Ferrous Metals | Steel | Reinforcement bar | Unspecified
Aluminium Sheet & Extruded profiles 31% 35.33% All 4 sheet/foil and extruded aluminium materials

 

Lost or Damaged in Transport Factors

Originally we assumed worse case assumption of 0.5% for all materials are lost or damaged during transport. However in lieu of available guidance from international standards, we’ve decided to change the default to zero.

However if you would like to account for this yourself, we suggest the following guide:

  • For materials with <5% construction waste = approx 10% of the construction waste for the lost/damaged in transport factors (i.e. 0.1% for steel frame, 0.5% for in-situ concrete)
  • For materials with >5% construction waste = a flat rate of 0.5% should be reasonable
RICS 2E Assumptions Original Assumption eTool Materials Affected
None specified, assumed zero by default 0.5% All materials

 